A whole house remodel in Dallas renovates the kitchen, baths, floors and finishes as one planned project instead of separate jobs. Many 1950s to 1980s Dallas houses wear out everywhere at once, so we design every room up front and run the trades in one sequence. It is the largest job in our home remodeling work.
  • 34 Google reviews
  • Design and build under one team
  • Based in Lake Highlands, Dallas
  • Mon–Fri 9 am–5 pm

A house that needs a new kitchen usually needs more: a hall bath from the same decade, floors patched room by room, tired doors and trim. Doing it all at once means less disruption than doing it in pieces, as long as the plan is complete before the first wall comes down.

What a Whole-House Remodel in Dallas Includes

A full house remodel with us is built from these pieces, chosen to fit your house:

  • Kitchen: layout, custom cabinets, stone counters, backsplash tile and lighting.
  • Bathrooms: primary, hall and powder rooms, with new showers or tubs, vanities and tile.
  • Floors throughout: one continuous hardwood, tile or luxury vinyl floor, or refinished original oak.
  • Walls and openings: wall removal where the plan calls for it, new doors, trim and paint.
  • Systems while walls are open: updated wiring and lighting, new supply lines and drains where old ones have worn out, done by licensed trades.

You get a full set of drawings, a selections list for every room and a line-item price before construction starts. The plan also settles which rooms stay usable in which weeks.

Marked-up floor plan for a whole-house remodel of a Dallas single-story home
A marked-up floor plan shows which walls, fixtures and floors change across the whole house.

Talk Through Your Whole-House Remodel Project

Tell us what is not working in the room today. We will walk through options, the order of work and what drives the price, then follow up with a written scope.

  • 34 Google reviews
  • Design and build under one team
  • Based in Lake Highlands, Dallas
  • Mon–Fri 9 am–5 pm

Gut Renovation or Targeted Update: Deciding What Stays

Not every whole-home renovation in Dallas is a gut job. The first design meeting is about sorting what is worth keeping from what has to go.

Solid oak floors, sound plaster walls and well-built original cabinet boxes can stay and be restored. Failing galvanized supply pipe, ungrounded wiring and water-damaged subfloors should go while the walls are open. If the layout already works and the rooms only look dated, an interior renovation focused on trim, doors, built-ins and paint may be the better fit than a gut renovation. We will tell you which one your house needs.

Two Dallas conditions push items onto the replace list. Blackland Prairie clay moves slabs enough to crack old tile and rack door frames, so cracked floors and sticking doors often signal a house-wide fix rather than a patch. And pre-1978 paint brings EPA lead-safe rules to every wall that gets cut.

Original oak strip flooring uncovered under old carpet during a Dallas house renovation
Original oak strip flooring exposed after carpet removal, a common find in older Dallas homes.

How a Full House Remodel Runs, Stage by Stage

One contract covers design and construction, so the same team carries the plan from drawings to the last coat of paint; our design-build remodeling page explains how.

  1. Whole-house walk-through. We measure every room, look in the attic and under sinks, and talk about budget, timing and how you live.
  2. Design for all rooms at once. Drawings and selections cover the kitchen, baths, floors and finishes together, so the materials relate and the price is complete.
  3. Engineering and permits. A structural engineer sizes any beams, and the permit set goes to the city before any regulated work begins.
  4. Protection, testing and demolition. Dust barriers and floor protection go in, suspect paint, ceiling texture and old flooring in older homes get tested before they are disturbed, and demolition opens the walls.
  5. Rough-in, inspection and install. Plumbing and electrical pass inspection, walls close, and cabinets, counters, tile, floors and trim follow in order.
  6. Room-by-room walkthrough. Each room gets checked against the drawings with you, open items are fixed, and final inspections sign off every permit.

In What Order Should Rooms Be Renovated?

The work moves by trade across the whole house rather than finishing one room before starting the next. That keeps each trade on site once and lets inspections cover several rooms at a time.

Demolition and framing come first, then rough plumbing, electrical and any HVAC changes, then inspections, insulation and drywall. Cabinets go in next, followed by countertop templating, tile and flooring. Sanding and finishing wood floors usually waits until near the end. Paint, trim, fixtures and hardware close it out.

Open stud walls with new electrical rough-in during a whole-home renovation in Dallas
New wiring and boxes in open stud walls wait for inspection before drywall goes up.

How Long Does a Complete Home Renovation Take?

A whole-house remodel takes months, and permit review is one variable. According to Jaspector (2026), a small residential structural permit in the City of Dallas can clear review in 1 to 3 business days, though another 2026 source puts typical review at 1 to 3 weeks. Custom cabinet lead times, stone fabrication and inspection scheduling add the rest. We give you a written schedule once selections are locked.

Chris M. said working with us meant "allowing you to focus on your work/life rather than managing the project," which is the goal on a job this size.

Engineering, Permits and Trades on a Whole Home Renovation

A remodel this large almost always touches regulated work. Every pipe that is moved or replaced is a job for a plumber licensed by the Texas State Board of Plumbing Examiners (TSBPE), every added circuit belongs to an electrician licensed by the Texas Department of Licensing and Regulation (TDLR), and inside Dallas city limits the permits are pulled by a contractor registered with the city. Get each number before you sign.

Age adds one more rule. If your house dates from before 1978, the EPA's Renovation, Repair and Painting rule says that anyone paid to sand, cut or demolish painted surfaces must work as an EPA-certified firm and follow lead-safe practices, an obligation that falls away only if testing finds no lead-based paint.

What Drives Whole House Remodel Cost in Dallas?

The biggest cost factors are the number of rooms, layout changes, the condition of the hidden systems, and material choices. Moving a kitchen sink on a slab means cutting concrete for the drain. Replacing all galvanized supply pipe adds plumbing labor but is far cheaper while walls are open than later. Custom cabinets and natural stone sit at the higher end.

Three more variables set the total: how many rooms are open at once, since fewer phases mean fewer trips for each trade; whether you live in the house, which adds dust walls, a temporary kitchen and daily cleanup; and how many permits and inspections the plan triggers. A price built on chosen tile and cabinets also holds better than one built on placeholder allowances. For dated ranges, see what a whole-house remodel costs across DFW, and remodel or move helps weigh the decision.

Finished hallway with new doors, trim and continuous wood floors after a Dallas whole-house remodel
New interior doors, painted trim and one continuous wood floor run from room to room after a full remodel.

Where We Take On Whole-Home Renovation Projects

From our Lake Highlands base we handle whole-house work across Dallas and nearby suburbs. In Plano, about 30 minutes north, east and central neighborhoods such as Los Rios still have original cabinets and cultured-marble baths. East of I-635, Mesquite has many brick houses built from the 1960s into the 1980s, and the post-war ranch houses inside LBJ Freeway in Farmers Branch often need everything at once.

Why Six Design Group for Whole-House Remodel

  • A single lead from first meeting to final walkthrough

    Arian and Ax lead our projects personally and stay on a whole-house job from the first walk-through to the punch list, so you are not re-explaining the plan to someone new each month.

  • Built for long, complex jobs

    Chris M. called a renovation with us "very long and complex," spanning the kitchen, wood floor, tiles, cabinets and more.

  • Schedules people can plan around

    Kyle T. wrote that "They meet deadlines," and Brandon R. described a project "completed on time and within the budget."

  • Clean, organized job sites

    When you live in a house under renovation, tidiness matters, and reviewers such as Katy F. point to how clean and efficient the job site stayed.

What Customers Say About Working With Us

Real words from Six Design Group customers on Google, quoted as written. Six Design Group has 34 Google reviews (checked November 2026).

“Six Design Group did an amazing job on my kitchen. They really listened to what I wanted and made it happen. The new cabinets and countertops look great and are very well made. The team was friendly, professional, and easy to work with. If you want quality work done by people who care, I highly recommend them.”
Jack W. · Google review · 2024
“Ax and Arian sat down with to fully understand what it was that I was trying to achieve. They were communicative throughout the process and most importantly to me kept on budget! Would most definitely recommend them for your remodeling needs!”
Hunter D. · Google review · 2024
“If you’re needing a kitchen remodeled, bathroom remodeled or other construction work ,Six Design Group does excellent work! You won’t find someone who is more dedicated and reliable to work with. I’ve known and sold Arian numerous homes and you won’t find a more hands on nice guy for your project.”
Glen C. · Google review · 2024

Read all reviewsLeave a review on Google

Where We Do Whole-House Remodel Around Dallas

Whole-House Remodel Questions, Answered

How long does a whole-house remodel take?

Plan in months rather than weeks. The calendar is set by the scope, permit review at your city's building office, cabinet and tile lead times, and whether the layout changes. Structural work and moved plumbing add inspection rounds. Once selections are final, we give you a written calendar marking when each room goes offline and comes back.

In what order should rooms be renovated?

Work runs by trade, not by room. Demolition, framing and rough plumbing and electrical happen across the whole house first, then walls close, then cabinets, counters and tile go in. Wood floor sanding and finishing usually come near the end so other trades do not scratch them. We keep one bathroom working for as long as possible.

Will a whole-house remodel need engineering or permits?

Yes, usually. Moving or adding plumbing and most electrical changes need permits in Dallas and the surrounding cities, and the work has to be done by TSBPE-licensed plumbers and TDLR-licensed electricians. Removing or cutting into a bearing wall needs a structural engineer's beam design and a building permit. Cosmetic work such as paint and trim does not.

Should we move out during a whole-house remodel?

Not always. It depends on how much of the house is open at once. Some families stay by living in finished rooms while others are worked on; others rent nearby for the middle stretch, when the kitchen and both baths are down together. We map this out during design so it is a planned choice, not a surprise.

Can my original hardwood floors be saved?

Yes, often. Many 1950s and 1960s Dallas houses still have their first oak strip flooring under carpet or vinyl, and it can usually be sanded and refinished. Where a wall comes out or a room was tiled, we weave in matching boards before sanding. Badly water-damaged or previously over-sanded floors may need replacing, which we check before you decide.

Can a whole-house remodel be split into phases?

Yes. Some owners do the kitchen and floors this year and the baths later. We still design the whole house at the start so the phases match, the wiring and plumbing for phase two are roughed in while walls are open, and nothing finished in phase one has to be torn out for the next.

Request an Estimate for Whole-House Remodel

Calling is fastest: (239) 545-0550. Or send the basics and we will call you back on the next business day.

Prefer to talk? Calling (239) 545-0550 is the fastest way to reach us. We reply to form requests on business days.

Related Services

Ready to Start Your Whole-House Remodel in Dallas?

Call to set up a consultation. We will look at the space, talk through options and the order of work, and follow up with a written scope you can compare.

  • 34 Google reviews
  • Design and build under one team
  • Based in Lake Highlands, Dallas
  • Mon–Fri 9 am–5 pm

Six Design Group · Lake Highlands, Dallas, TX 75238 · (239) 545-0550 · ax@sixdesigngroup.com · Monday – Friday 9:00 am – 5:00 pm · Saturday – Sunday Closed

Call (239) 545-0550Estimate